The Sound path is the flagship of the Toggenburg World of Sound. Over the past 20 years, the themed trail at the foot of the Churfirsten mountains has been visited by up to 50,000 people a year.
Under the leadership of Christian Zehnder, the artistic director of Klangwelt Toggenburg, the sound trail has been completely renewed and revised. The most beautiful and important works on the existing trail have been carefully restored. There are also twelve new works of sound art to discover. International sound artists have created diverse, exciting works that visitors are invited to explore, listen to and, of course, bring to life. Themes such as nature, soundscape, ecology, climate and mindfulness have been incorporated.
The newly developed scenography and signage consists of a modular system with bright yellow columns and round signs made of stainless steel. The bright poles are visible over long distances and thus also serve as signposting elements.
The signage is inspired by the marker poles on ski slopes and the orientation poles for snow plows on winter roads. It is therefore an aesthetic that is already very familiar in the local environment. The modularity of the individual elements means that the sound sculptures can be customized. The combination of the slender steles and the round signs is also reminiscent of musical notes that run through the landscape like a score.
Each of the 25 sound installations has an information sign on which the most important information about the respective station is visible. In addition, there are so-called "information islands" at particularly important places along the six-kilometre route, which also display general information and a large overview map.
The minimalist intervention, designed to have a long-distance effect, connects the various sound installations. At the same time, it blends in carefully with nature and subtly stages the soundscape between the individual installations.
For the Oberdorf chairlift, a separate "sound ride" was also developed by Idee und Klang, which forms an introduction or conclusion to the sound trail and can be accessed on site with a corresponding app on the phone.
The sound trail was officially opened at Whitsun with a sound festival featuring three concert evenings with internationally renowned musicians and a vernissage.
The signage of the sound trail is also a small preview of the new appearance of Klangwelt Toggenburg, which is currently being developed by Studio Marcus Kraft and will be published towards the end of 2024. The Klanghaus - currently still under construction - will then open in May 2025.
Artistic direction: Christian Zehnder. CEO sound world: Mirjam Hadorn. Sound scenography: Idea and sound audio design. Scenography space: Studio Frank Dittmann. Signage & graphic design: Studio Marcus Kraft. Texts Klangweg: Bettina Mittelstrass. Project management Klangcampus: Guy Loretan. Project management Klangwelt: Kathrin Dörig, Edi Hartmann. Accompanying construction: Christian Gauer.
]]>
For children, too, the first impression always counts. It is therefore all the more important to create a child-friendly atmosphere in a children's practice. In addition to the interior, the visual appearance is crucial. And with it, a friendly, congenial appearance.
Kooi is awarded a Red Dot Award: Brands & Communication Design 2022 in the category "Brand Design and Signetics" for the new appearance of the Solothurn children's practice "TocToc". In addition to logo and signaletics, Kooi also realized the naming and the website. The jury was convinced by the good design quality and creative performance.
With around 20,000 entries, the Red Dot Award is one of the largest design competitions in the world. The Red Dot label stands internationally as a seal of quality for good design and creative achievement. The award ceremony will take place in Berlin on October 28, 2022.


Customer: Children's practice "TocToc", Solothurn. Agency: Kooi.
]]>
Since the timetable change in December 2021, various changes to services have been in force throughout the entire area covered by Verkehrsbetriebe Zürich. These primarily affect the two transport hubs Central and Bellevue, where, among other things, the night network has changed significantly. Evoq has realized a new generation of bus stop posters on behalf of VBZ.
The new large-format posters are prominently displayed at Central and Bellevue. They focus less on individual stops and more on multifunctional transportation hubs, including the nighttime network.
The Bellevue plan shows the spatial connection with the surrounding stops at Stadelhofen station and the Opera House, while for Central the neighborhood is shown together with Bahnhofquai/HB as a whole. The precise listing of all stops in the plan should help to find the right line. The three-dimensional representation of the surrounding buildings and landmarks should also facilitate orientation on site. The posters thus complement the numerous mobile public transport apps and the regular VBZ stop information at the stops.
The plan bases were built from 3D and GIS data from Swisstopo. The proven representation from the SBB Trafimage world served as the design basis.

Customer: Zurich Transport VBZ. Responsible at Evoq: Christian Sutter. Project Management: Claudia Sutter. Graphic: Martha Bonk.
]]>
In June 2016, Coop opened the new logistics and bakery center in Schafisheim, with a national deep-freeze warehouse, an empties center, the wholesale bakery, and a pastry shop. Today, around 1900 employees work in this largest bakery in Switzerland.




Detours cost time and therefore money. Therefore, clear wayfinding is essential for a building of this size. Coop awarded the contract for planning the guidance and orientation system to Frontwork.

The design included 180 wayfinding signs, 600 door signs and 300 room signs. The installation was spread over 18 floors, 9 of which were basements. By comparison, the building holds about as much space as 500 Olympic swimming pools. All work in the hygiene area was carried out in special protective clothing. The walking distance for each employee was 15 - 20 kilometers per day.

The ambitious time window from briefing to project completion was eleven weeks. Thanks to the close, professional cooperation and constant exchange between Frontwork's project management and Coop's construction planning, the project was completed on schedule.





Responsible at Coop: Daniel P. Hintermann (Head of Logistics Region Northwest Switzerland). Responsible at Frontwork: Sandro Oliva, Michael Ludwig.